Poulan PR624 User Manual - Page 6

Install Discharge Chute / Chute Rotater, Head See Fig. 7, Check Tire Pressure

Page 6 highlights

ASSEMBLY / PRE-OPERATION INSTALL AUGER CONTROL ROD (See Figs. 5 and 6) 1. Retrieve vinyl sleeve and spring from bag of parts and retrieve the auger control rod from carton chute tray. Slide straight rod end through the small hole in the vinyl sleeve. Hook spring in hole in rod end. 2. Hook end of spring into control arm with loop opening up as shown. (See Fig. 5) 3. With top end of rod positioned under right side of control panel, push down on rod and insert end of rod into hole in auger control bracket. Secure with retainer spring. INSTALL DISCHARGE CHUTE / CHUTE ROTATER HEAD (See Fig. 7) NOTE: The multi-wrench provided in your parts bag may be used to install the chute rotater head. 1. Place discharge chute assembly on top of chute base with discharge opening toward front of snow thrower. 2. Position chute rotater head over chute bracket. If necessary, rotate chute assembly to align square and pin on underside of chute rotater head with holes in chute bracket. 3. With chute rotater head and chute bracket aligned, position chute rotater head on pin and threaded stud of mounting bracket. 4. Install 3/8 washer and locknut on threaded stud and tighten securely. CONTROL ARM AUGER CONTROL ROD VINYL SLEEVE CHUTE ROTATER HEAD 3/8 LOCKNUT 3/8 WASHER LOOP OPENING UP FIG. 5 AUGER CONTROL ROD AUGER CONTROL RETAINER LEVER SPRING PIN THREADED STUD CHUTE BRACKET ALIGN BEFORE TIGHTENING LOCKNUT FIG. 7 ROTATER HEAD MOUNTING BRACKET CHECK TIRE PRESSURE The tires on your snow thrower were overinflated at the factory for shipping purposes. Correct and equal tire pressure is important for best snow throwing performance. • Reduce tire pressure to 14-17 PSI. AUGER CONTROL BRACKET FIG. 6 6

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40

6
ASSEMBLY / PRE-OPERATION
INSTALL DISCHARGE CHUTE / CHUTE ROTATER
HEAD (See Fig. 7)
NOTE:
The multi-wrench provided in your parts bag may
be used to install the chute rotater head.
1.
Place discharge chute assembly on top of chute base
with discharge opening toward front of snow thrower.
2.
Position chute rotater head over chute bracket.
If neces-
sary, rotate chute assembly to align square and pin on un-
derside of chute rotater head with holes in chute bracket.
3.
With chute rotater head and chute bracket aligned,
position chute rotater head on pin and threaded stud
of mounting bracket.
4.
Install 3/8 washer and locknut on threaded stud and
tighten securely.
CHECK TIRE PRESSURE
The tires on your snow thrower were overinflated at the fac-
tory for shipping purposes.
Correct and equal tire pressure
is important for best snow throwing performance.
Reduce tire pressure to 14-17 PSI.
CHUTE
ROTATER
HEAD
3/8 WASHER
3/8 LOCKNUT
THREADED
STUD
PIN
ROTATER HEAD
MOUNTING
BRACKET
CHUTE
BRACKET
FIG. 7
ALIGN BEFORE
TIGHTENING LOCKNUT
AUGER
CONTROL
LEVER
AUGER CONTROL ROD
AUGER
CONTROL
BRACKET
RETAINER
SPRING
FIG. 6
INSTALL AUGER CONTROL ROD (See Figs. 5 and 6)
1.
Retrieve vinyl sleeve and spring from bag of parts and
retrieve the auger control rod from carton chute tray.
Slide straight rod end through the small hole in the
vinyl sleeve. Hook spring in hole in rod end.
2.
Hook end of spring into control arm with loop opening
up as shown. (See Fig. 5)
3. With top end of rod positioned under right side of
control panel, push down on rod and insert end of rod
into hole in auger control bracket.
Secure with retainer
spring.
AUGER
CONTROL
ROD
CONTROL
ARM
VINYL
SLEEVE
LOOP
OPENING
UP
FIG. 5