RCA RACE8002E English Manual - Page 6

Installation, Instructions

Page 6 highlights

INSTALLATION INSTRUCTIONS 1 PREPARE THE WINDOW Lower sash must open sufficiently to allow a clear vertical opening of 13 inches (330mm). Side louvers and the rear of the AC must have clear air space to allow enough airflow through the condenser, for heat removal. The rear of the unit must be outdoors, not inside a building or garage. Mounting Hardware C: Align the hole in the top rail with those in the top of the unit as shown in Fig.B Fig.B 3/ 4 (or 1/ 2 ) Screws (7) (For Wooden (For Vinyl-Clad windows) windows) (on some models) Lock Frame Lock Frame Sash Lock Window sash (2) (2) (1) seal foam (1) D: Secure the top rail to the unit with the 3/8 Screws as shown in Fig.C. Fig.C 2 PREPARE AIR CONDITIONER A: Remove the air conditioner from the carton and place on a flat surface. B: Remove top rail from the rear of the packaging material as shown in Fig. A. Top Rail Hardware or Weather stripping (10 *3/4 *1/12 ) (5) 3/8 Screws (4) Top Rail (1) R1 hardware (2) Fig.A Packaging R1 hardware (for 10000Btu/h models only ) NOTE: For safety reasons, all four(4) screws MUST be securely fastened. NOTE: The top rail hardware and the Fig.A, Fig.B and Fig.C are not applicable to the units more than 10000Btu/h. Before installing unit, the top rail must be assembled on the unit (For

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56

INSTALLATION
INSTRUCTIONS
PREPARE THE WINDOW
1
Mounting Hardware
PREPARE AIR CONDITIONER
2
INSTALL THE ACCORDION PANELS
3
NOTE:
Top rail and Sliding Panels at each side are
offset to provide the proper pitch to the rear of (5/16 ).
This is
necessary for proper condensed water
utilization and drainage. If you are not using the Side
Panels for any reason, this pitch to the rear must be
maintained.
A.Place unit on floor, a bench or
a table. Hold the
Accordion
Panel in one hand and gently
pull back the center to free the
open end. See Fig.1
Fig.1
Lower sash must open sufficiently to allow a clear
vertical opening of 13 inches (330mm). Side louvers
and the rear of the AC must have clear air space to
allow enough airflow through the condenser, for heat
removal. The rear of the unit must be outdoors, not
inside a building or garage.
A: Remove the air conditioner from the carton and
place on a flat surface.
B:
Remove top rail from the rear of the packaging
material as shown in Fig. A.
Top Rail Hardware
3/8
Screws
(4)
Top Rail
(1)
or
Top Rail Hardware
3/8
Screws
(4)
Top Rail
(1)
or
3/ 4
(or 1/
Screws
(7)
2
)
Lock Frame
(2)
Sash Lock
(1)
Window sash
seal foam
(1)
Lock Frame
(2)
(For Wooden
windows)
(For Vinyl-Clad
windows)
(on some models)
R1 hardware
(2)
(10 *3/4 *1/12 )
Weather stripping
(5)
Packaging
Fig.A
Top Rail
R1 hardware(for
>
)
10000Btu/h models
only
R1 hardware
(for <
)
10000
Btu/h models
only
Fig.C
NOTE: The top rail hardware and the Fig.A,
Fig.B
and
Fig.C are not applicable to the units
more than 10000Btu/h. Before installing unit,
the top rail must be assembled on the unit (For
<10000Btu/h models only).
C:
Align the hole in the top rail with those in the top
of
the unit as shown in Fig.B
D:
Secure the top rail to the unit with the 3/8
Screws
as shown in Fig.C.
NOTE:
For safety reasons, all four(4) screws MUST
be securely fastened.
Fig.B