Reebok 8000 Es Treadmill English Manual - Page 9

second Bolt Spacer 79, M10 x 96mm Bolt

Page 9 highlights

5. With the help of a second person, carefully tip the treadmill onto its right side. Partially fold the Frame (48) so the treadmill is more stable; do not fully fold the Frame yet. Remove and discard the two indicated bolts (A) and the shipping bracket (B). Attach a Base Pad (81) to the Base (85) in the location shown with an M4.2 x 25mm Tek Screw (2) and a Base Pad Spacer (104). Then, attach a Base Pad (81) in the location shown with only an M4.2 x 25mm Tek Screw (2). Remove the M10 Nut (33), the M10 x 50mm Bolt (4), and the shipping bracket (C) from the Base (85). Attach a Wheel (86) with the Bolt and the Nut that you just removed. Do not overtighten the Nut; the Wheel must turn freely. Discard the shipping bracket. 5 A 2 81 85 B 48 4 104 86 2 81 C 33 6. Press a Base Endcap (82) into the Base (85). With the help of a second person, hold a Bolt Spacer (79) inside the lower end of the Left Upright (73). Insert an M10 x 96mm Bolt (5) with an M10 Star Washer (8) into the Left Upright and the Bolt Spacer. Repeat this step with a second Bolt Spacer (79), M10 x 96mm Bolt (5), and M10 Star Washer (8). Orient the Left Upright (73) and the Left Upright Spacer (83) as shown. Hold the Left Upright Spacer and the Left Upright against the Base (85). Tighten the M10 x 96mm Bolts (5) until the heads of the Bolts touch the Left Upright; do not fully tighten the Bolts yet. With the help of a second person, tip the treadmill so that the Base (85) is flat on the floor. 7. Set the Console (87) face down on a soft surface to avoid scratching the Console. Remove the six M4.2 x 19mm Screws (1). Lift off the Pulse Support (109). Save the Pulse Support and all six M4.2 x 19mm Screws (1) for step 9. 6 5 8 82 79 85 73 83 7 1 1 109 1 87 9

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

5.
With the help of a second person, carefully tip
the treadmill onto its right side. Partially fold the
Frame (48) so the treadmill is more stable;
do
not fully fold the Frame yet.
Remove and discard the two indicated bolts (A)
and the shipping bracket (B).
Attach a Base Pad (81) to the Base (85) in the
location shown with an M4.2 x 25mm Tek Screw
(2) and a Base Pad Spacer (104). Then, attach
a Base Pad (81) in the location shown with only
an M4.2 x 25mm Tek Screw (2).
Remove the M10 Nut (33), the M10 x 50mm
Bolt (4), and the shipping bracket (C) from the
Base (85). Attach a Wheel (86) with the Bolt and
the Nut that you just removed.
Do not over-
tighten the Nut; the Wheel must turn freely.
Discard the shipping bracket.
5
85
86
48
4
33
C
81
2
81
104
2
6.
Press a Base Endcap (82) into the Base (85).
With the help of a second person, hold a Bolt
Spacer (79) inside the lower end of the Left
Upright (73). Insert an M10 x 96mm Bolt (5) with
an M10 Star Washer (8) into the Left Upright
and the Bolt Spacer.
Repeat this step with a
second Bolt Spacer (79), M10 x 96mm Bolt
(5), and M10 Star Washer (8).
Orient the Left Upright (73) and the Left Upright
Spacer (83) as shown. Hold the Left Upright
Spacer and the Left Upright against the Base
(85). Tighten the M10 x 96mm Bolts (5) until the
heads of the Bolts touch the Left Upright;
do not
fully tighten the Bolts yet.
With the help of a second person, tip the tread-
mill so that the Base (85) is flat on the floor.
83
73
5
85
79
82
8
6
7.
Set the Console (87) face down on a soft sur-
face to avoid scratching the Console. Remove
the six M4.2 x 19mm Screws (1).
Lift off the Pulse Support (109).
Save the Pulse
Support and all six M4.2 x 19mm Screws (1)
for step 9.
1
1
1
7
87
109
9
B
A