Samsung RF24R7201SR User Manual - Page 57
Provision for Open Access to the Connected Product Requirements
View all Samsung RF24R7201SR manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 57 highlights
Provision for Open Access to the Connected Product Requirements 1. SGIP Open Standards (Smart Energy Profile 2.0 - http://www.csep.org/) - Energy Consumption Reporting - Demand Response 2. Samsung OPEN API - Operational Status, User Settings & Messages - ICE Maker Status: GET /icemaker/status/vs/0 - Door Open Alarm: GET /doors/vs/0 - DR Status: GET /drlc/vs/0 - Delay Defrost Capability - Set Schedule of the Defrost Delay: POST /defrost/reservation/vs/0?op=add - Get Schedule of the Defrost Delay : GET /defrost/reservation/vs/0 - Delete Schedule of the Defrost Delay: POST /defrost/reservation/vs/0?op=remove - Defrost Delay On/OFF: POST /defrost/delay/vs/0 Operations Untitled-1 57 English 57 2020-04-21 12:38:13
English
57
Operations
Provision for Open Access to the Connected Product Requirements
1.
SGIP Open Standards (Smart Energy Profile 2.0 - http://www.csep.org/)
- Energy Consumption Reporting
- Demand Response
2.
Samsung OPEN API
- Operational Status, User Settings & Messages
- ICE Maker Status: GET /icemaker/status/vs/0
- Door Open Alarm: GET /doors/vs/0
- DR Status: GET /drlc/vs/0
- Delay Defrost Capability
- Set Schedule of the Defrost Delay: POST /defrost/reservation/vs/0?op=add
- Get Schedule of the Defrost Delay : GET /defrost/reservation/vs/0
- Delete Schedule of the Defrost Delay: POST /defrost/reservation/vs/0?op=remove
- Defrost Delay On/OFF: POST /defrost/delay/vs/0
Untitled-1
57
2020-04-21
°° 12:38:13