Samsung RF265BEAESR/AA User Manual - Page 51
Provision for Open Access to the Connected Product Requirements
View all Samsung RF265BEAESR/AA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 51 highlights
Provision for Open Access to the Connected Product Requirements 1. SGIP Open Standards (Smart Energy Profile 2.0 - http://www.csep.org/) - Energy Consumption Reporting - Demand Response 2. OPEN API - Operational Status, User Settings & Messages - ICE Maker Status: GET /icemaker/status/vs/0 - Door Open Alarm: GET /doors/vs/0 - DR Status: GET /drlc/vs/0 - Delay Defrost Capability - Set Schedule of the Defrost Delay: POST /defrost/reservation/vs/0?op=add - Get Schedule of the Defrost Delay : GET /defrost/reservation/vs/0 - Delete Schedule of the Defrost Delay: POST /defrost/reservation/vs/0?op=remove - Defrost Delay On/OFF: POST /defrost/delay/vs/0 Operations Untitled-1 51 English 51 4/26/2017 9:54:34 PM
English
51
Operations
Provision for Open Access to the Connected Product Requirements
1.
SGIP Open Standards (Smart Energy Proļ¬le 2.0 - http://www.csep.org/)
- Energy Consumption Reporting
- Demand Response
2.
OPEN API
-
Operational Status, User Settings & Messages
-
ICE Maker Status: GET /icemaker/status/vs/0
-
Door Open Alarm: GET /doors/vs/0
-
DR Status: GET /drlc/vs/0
- Delay Defrost Capability
-
Set Schedule of the Defrost Delay: POST /defrost/reservation/vs/0?op=add
-
Get Schedule of the Defrost Delay : GET /defrost/reservation/vs/0
-
Delete Schedule of the Defrost Delay: POST /defrost/reservation/vs/0?op=remove
-
Defrost Delay On/OFF: POST /defrost/delay/vs/0
Untitled-1
51
4/26/2017
9:54:34 PM