Samsung RT21M6215SR/AA User Manual - Page 15
Step-by-step installation, STEP 1
View all Samsung RT21M6215SR/AA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 15 highlights
Step-by-step installation STEP 1 Select a site Select a site that: • Has a solid, level surface without carpeting or flooring that may obstruct ventilation • Is away from direct sunlight • Has adequate room for opening and closing the door • Is away from any heat sources • Provides room for maintenance and servicing • Has a temperature range between 50 °F (10 °C) and 109 °F (43 °C) Installation Untitled-4 15 English 15 2020-03-17 7:03:17
English
15
Installation
Step-by-step installation
STEP 1
Select a site
Select a site that:
•
Has a solid, level surface without carpeting or flooring that may obstruct ventilation
•
Is away from direct sunlight
•
Has adequate room for opening and closing the door
•
Is away from any heat sources
•
Provides room for maintenance and servicing
•
Has a temperature range between 50 °F (10 °C) and 109 °F (43 °C)
Untitled-4
15
2020-03-17
°° 7:03:17