Sennheiser ew 145 G3 Instructions for use - Page 13
Putting the devices into operation, EM 100 receiver, Setting up the receiver on a flat surface
View all Sennheiser ew 145 G3 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 13 highlights
Putting the devices into operation Putting the devices into operation EM 100 receiver You can set up the receiver on a flat surface or mount it into a 19" rack. For information on rack mounting, refer to the instruction manual of the EM 100 receiver available on the ew G3 product page at www.sennheiser.com. Setting up the receiver on a flat surface Place the receiver on a flat, horizontal surface. Please note that the device feet can leave stains on delicate surfaces. The stacking elements are designed to help protect the operating elements from damage or deformation, e.g. if the receiver is dropped. Therefore, fasten the stacking elements, even if you do not want to stack your receivers. Fastening the stacking elements To fasten the stacking elements ƻ: ̈ Unscrew and remove the two recessed head screws (M4x8) on each side of the receiver (see diagram). ̈ Secure the stacking elements ƻ to the sides of the receiver using the previously removed recessed head screws (see diagram). ƻ Fitting the device feet The device feet are fitted to the base of the receiver (see diagram). If you want to stack receivers (see following section), only fit the device feet to the base of the lowermost receiver. ̈ Clean the base of the receiver where you want to fix the device feet. ̈ Fix the device feet to the base of the receiver by peeling off the backing paper and fitting them as shown on the left. 11