Sharp PN-H801 UL - Page 1

Sharp PN-H801 Manual

Page 1 highlights

NOTICE OF COMPLETION AND AUTHORIZATION TO APPLY THE UL MARK Sharp Electronics Corp Mr. YOUHEI EGAWA Suite 1 1 Sharp Plaza Mahwah Nj 07495-1123, Us 2015/11/06 Our Reference: Your Reference: Project Scope: File E242461, Vol. X3 and X4 Project Number PSJ-BSL5-053A0 Order No.10949108 UL/cUL:LCD Monitor, PN-*H801*** 4787074717 Dear Mr. YOUHEI EGAWA: Congratulations! UL's investigation of your product(s) has been completed under the above Reference Number and the product was determined to comply with the applicable requirements. This letter temporarily supplements the UL Follow-Up Services Procedure and serves as authorization to apply the UL Mark at authorized factories under UL's Follow-Up Service Program. To provide your manufacturer(s) with the intended authorization to use the UL Mark, you must send a copy of this notice to each manufacturing location currently authorized under File E242461, Vol. X3 and X4. Records in the Follow-Up Services Procedure covering the product are now being prepared and will be sent in the near future. Until then, this letter authorizes application of the UL Mark for 90 days from the date indicated above. Additional requirements related to your responsibilities as the Applicant can be found in the document "Applicant responsibilities related to Early Authorizations" that can be found at the following web-site: http://www.ul.com/EAResponsibilities Any information and documentation provided to you involving UL Mark services are provided on behalf of UL LLC (UL) or any authorized licensee of UL. We are excited you are now able to apply the UL Mark to your products and appreciate your business. Feel free to contact me or any of our Customer Service representatives if you have any questions. Very truly yours, Tadao Nakayama +81 596 24 7247 Staff Engineer [email protected] Reviewed by: Bruce A. Mahrenholz 847-664-3009 CPO Director [email protected] NBK160F-22537D This is an electronically generated letter. Signatures are not required for this document to be valid. Page 1 of 1

  • 1

NOTICE OF COMPLETION
AND
AUTHORIZATION TO APPLY THE UL MARK
This is an electronically generated letter. Signatures are not required for this document to be valid.
Page 1 of 1
2015/11/06
Sharp Electronics Corp
Mr. YOUHEI EGAWA
Suite 1
1 Sharp Plaza
Mahwah Nj 07495-1123, Us
Our Reference:
File E242461, Vol. X3 and X4
Project Number
4787074717
Your Reference:
PSJ-BSL5-053A0
Project Scope:
Order No.10949108 UL/cUL:LCD Monitor, PN-*H801***
Dear Mr. YOUHEI EGAWA:
Congratulations!
UL's investigation of your product(s) has been completed under the above Reference Number and
the product was determined to comply with the applicable requirements.
This letter temporarily supplements the UL
Follow-Up Services Procedure and serves as authorization to apply the UL Mark at authorized factories under UL's
Follow-Up Service Program. To provide your manufacturer(s) with the intended authorization to use the UL Mark,
you must send a copy of this notice to each manufacturing location currently authorized under File E242461, Vol. X3
and X4.
Records in the Follow-Up Services Procedure covering the product are now being prepared and will be sent in the
near future.
Until then, this letter authorizes application of the UL Mark for 90 days from the date indicated above
.
Additional requirements related to your responsibilities as the Applicant can be found
in the document “Applicant
responsibilities related to Early Authorizations” that can be found at the following web
-site:
Any information and documentation provided to you involving UL Mark services are provided on behalf of UL LLC
(UL) or any authorized licensee of UL.
We are excited you are now able to apply the UL Mark to your products and appreciate your business.
Feel free to
contact me or any of our Customer Service representatives if you have any questions.
Very truly yours,
Reviewed by:
Tadao Nakayama
Bruce A. Mahrenholz
+81 596 24 7247
847-664-3009
Staff Engineer
CPO Director
NBK160F-22537D