TP-Link TL-SL3452 User Guide - Page 32
and then continues to boot. The following screen is an example of
UPC - 845973020507
View all TP-Link TL-SL3452 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 32 highlights
TL-SG3109/TL-SL3428/TL-SL3452 Gigabit Managed Switch Family Installation Guide the device is fully operational before completely booting. If a critical problem is detected, the program flow stops. If POST passes successfully, a valid executable image is loaded into RAM. POST messages are displayed on the terminal and indicate test success or failure. As the device boots, the bootup test first counts the device memory availability and then continues to boot. The following screen is an example of the displayed POST: ------ Performing the Power-On Self Test (POST) -----UART Channel Loopback Test PASS Testing the System SDRAM PASS Boot1 Checksum Test PASS Boot2 Checksum Test PASS Flash Image Validation Test PASS BOOT Software Version 1.0.0.04 Built 29-Nov-2005 11:56:12 TPLink Switch based on 88E6218 with ARM946E-S. 32MByte SDRAM. I-Cache 8 KB. D-Cache 8 KB. Cache Enabled. Autoboot in 2 seconds - press RETURN or Esc. to abort and enter prom. Preparing to decompress... The boot process runs for approximately 60 seconds. The auto-boot message displayed at the end of POST (see the last lines) 25