TRENDnet TEW-OA24D User's Guide - Page 2
Installation Procedure
UPC - 710931502381
View all TRENDnet TEW-OA24D manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 2 highlights
Installation Procedure 1. Place the feeder's support pole between the grids and assemble the grids with M5 bolts, washers and nuts. Do not tighten the nuts at this moment. 2. Vertical Polarization, for most applications. The illustration here shows horizontal polarization. Most applications probably use "vertical polarization", which you would turn the "feeder" 90 degrees.
Installation Procedure
1. Place the feeder’s support pole between the grids and assemble the grids with M5 bolts,
washers and nuts
. Do not tighten the nuts at this moment.
2.
The illustration here shows
horizontal polarization.
Most
applications probably use “vertical
polarization”,
which you would turn
the “feeder” 90 degrees.
Vertical Polarization, for most applications.