Thermador VTR1330P Installation Manual - Page 5

Step 3: Installation

Page 5 highlights

Step 3: INSTALLATION 1. Hold the blower on the wall. Note the direction of the air conduction. 2. Mark the 4 mounting boreholes. • At least one screw must be installed through a stud. • All hardware must be suitable for the wall's construction materials. • Ensure the air outlet points downward. 3. Wall break: Mark and drill a guide hole and a separate hole for electrical conduit. 4. Drill the 4 x ¼'' (6,3 mm) Ø mounting boreholes. Insert wall anchors and screw the blower to the wall. 5. Connect the ducting from the blower to the extractor hood and feed to the outside. min. 40" (101.5 cm) min. Ø 10½" (267 mm) 513/16" (148 mm) ¾" (19 mm) 7 3/16" (183 mm) 15½" (394 mm) 6 5/16" (160 mm) 13/16" (21 mm) 21¼" (540 mm) English 3

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22

English 3
Step 3: INSTALLATION
1.
Hold the blower on the wall.
Note the direction of the air conduction.
2.
Mark the 4 mounting boreholes.
At least one screw must be installed through a
stud.
All hardware must be suitable for the wall’s
construction materials.
Ensure the air outlet points downward.
3.
Wall break:
Mark and drill a guide hole and a separate hole for
electrical conduit.
4.
Drill the 4 x ¼'' (6,3 mm) Ø mounting boreholes.
Insert wall anchors and screw the blower to the wall.
5.
Connect the ducting from the blower to the extractor
hood and feed to the outside.
min. 40"
(101.5 cm)
min. 40"
(101.5 cm)
min. 40"
(101.5 cm)
¾"
(19 mm)
¾"
(19 mm)
¾"
(19 mm)
(148 mm)
(148 mm)
(148 mm)
min. Ø 10½"
(267 mm)
min. Ø 10½"
(267 mm)
min. Ø 10½"
(267 mm)
13
/
16
"
13
/
16
"
13
/
16
"
5
(160 mm)
(160 mm)
(160 mm)
5
/
16
"
5
/
16
"
5
/
16
"
6
(183 mm)
(183 mm)
(183 mm)
3
/
16
"
3
/
16
"
3
/
16
"
7
(21 mm)
(21 mm)
(21 mm)
13
/
16
"
13
/
16
"
13
/
16
"
15½"
(394 mm)
15½"
(394 mm)
15½"
(394 mm)
21¼"
(540 mm)
21¼"
(540 mm)
21¼"
(540 mm)