Toshiba A105-S4334 Maintenance Manual - Page 215
Replacement Procedures, 18 Switch Cover and Switch Board
UPC - 032017680159
View all Toshiba A105-S4334 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 215 highlights
4 Replacement Procedures 4.18 Switch Cover and Switch Board Figure 4-39 Removing the switch Board Install the Switch Cover and Switch Board Install the switch board according to the following procedures and Figures 4-38, 4-39. 1. Seat the switch board in the correct position. 2. Seat the switch cover in the correct position and secure the following 7 latches, in that order: - Two right latches - One latch on the front and bottom sides - Three left latches 3. Turn the top cover upside down. 4. Secure the switch board with two M2.5x4 black flat-head screws. 5. Connect the switch board flat cables to CN4000 on the switch board. 6. Secure the EMI tape and Mylar in the correct position. 4-62 Satellite A100/A105 / TECRA A7 Maintenance Manual
4 Replacement Procedures
4.18 Switch Cover and Switch Board
4-62
Satellite A100/A105 / TECRA A7
Maintenance Manual
Figure 4-39 Removing the switch Board
Install the Switch Cover and Switch Board
Install the switch board according to the following procedures and Figures 4-38, 4-39.
1.
Seat the switch board in the correct position.
2.
Seat the switch cover in the correct position and secure the following 7 latches, in that order:
- Two right latches
- One latch on the front and bottom sides
- Three left latches
3.
Turn the top cover upside down.
4.
Secure the switch board with two M2.5x4 black flat-head screws.
5.
Connect the switch board flat cables to CN4000 on the switch board.
6.
Secure the EMI tape and Mylar in the correct position.