Viking VWCI5150GRSS Installation Instructions - Page 16
Installation Checklist
View all Viking VWCI5150GRSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 16 highlights
Installation Checklist IMPORTANT: To ensure a safe and proper installation, review below items directly with installer. □ Has all shipping tape, string and packing been removed? □ Has the unit been secured in place with the provided anti-tip bracket or is the unit 1 inch or less from a solid soffit? □ Are all levelers extended down to make contact with the floor? □ Is the unit level? □ Is the power cord connected directly into a properly grounded 3-prong outlet in accordance with all applicable local codes? □ Has all stainless protection film been removed? □ Are the panel(s) (wood overlays, if used) attached securely and properly? □ Allow the unit to operate for at least 24 hours before loading products or adjusting temperature settings. 16