Vtech Go Go Smart Wheels Spiral Construction Tower User Manual - Page 18
Base into the Bridge Support, and insert the L-shape Plate Plates
View all Vtech Go Go Smart Wheels Spiral Construction Tower manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 18 highlights
B. Insert the Conveyor Support into the Conveyor Belt, the SmartPoint® Loading Location into the Conveyor Support, and the Exit Gate into Conveyor Belt. 6. Assemble and attach the construction tower components following the steps as below: A. Insert the Switch Gate into Track F. Connect Track F to the 3-loop spiral tower, connect the bridge part to Track F, insert the Spiral Track Base into the Bridge Support, and insert the L-shape Plate Plates into Track F. 18
18
B.
Insert the Conveyor Support into the Conveyor Belt, the
SmartPoint
®
Loading Location into the Conveyor Support, and the
Exit Gate into Conveyor Belt.
6.
Assemble and attach the construction tower components following
the steps as below:
A.
Insert the Switch Gate into Track F.
Connect Track F to the 3-loop
spiral tower, connect the bridge part to Track F, insert the Spiral Track
Base into the Bridge Support, and insert the L-shape Plate Plates
into Track F.