Vtech Go Go Smart Wheels Train Station Playset User Manual - Page 7

Getting Started - configurations

Page 7 highlights

Getting Started STORAGE TOWER 1. Attach the storage tower structure to its SmartPointTM track. You will hear a 'click' sound to indicate the structure is secure. After the above steps, connect these pieces to the included track pieces. You can configure them into different arrangements. GETTING STARTED BATTERY INSTALLATION - TRAIN 1. Make sure the unit is turned OFF. 2. Locate the battery cover on the bottom of the unit. Use a screwdriver to loosen the screw. 3. Install 3 new AAA (AM-4/LR03) batteries following the diagram inside the battery box. (The use of new alkaline batteries is recommended for maximum performance.) 4. Replace the battery cover and tighten the screw to secure. 6

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15

6
STORAGE TOWER
1. Attach the storage tower
structure to its
SmartPoint
TM
track. You will hear a ‘click’
sound to indicate the structure
is secure.
After the above steps, connect these pieces to the included track pieces.
You can configure them into different arrangements.
GETTING STARTED
BATTERY INSTALLATION - TRAIN
1.
Make sure the unit is turned
OFF
.
2.
Locate the battery cover on the bottom of the
unit. Use a screwdriver to loosen the screw.
3. Install 3 new AAA (AM-4/LR03) batteries
following the diagram inside the battery
box.
(The use of new alkaline batteries is
recommended for maximum
performance.)
4. Replace the battery cover and tighten the
screw to secure.
Getting Started