Waring WPO100 Instruction Manual - Page 9
Oven Installation, Pizza Ceramic Deck Installation, & Conditioning
View all Waring WPO100 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 9 highlights
OVEN INSTALLATION 1. After removing the outer shipping carton and packaging material, place the oven on the floor or other flat surface. 2. Open oven and remove any instructions or packaging material shipped inside the unit. 3. For the Double Oven, lift up the front of the oven and attach the two front legs (packed separately in styrofoam), carefully twisting each one into a corner and hand-tightening. Lift the back of the oven and attach the two back legs and hand-tighten. 4. Move the oven to its final location. For Double Oven, adjust the bottom portion of the legs to level the unit (fig. 1). (fig. 1) PIZZA CERAMIC DECK INSTALLATION & CONDITIONING Read these instructions carefully before installing or conditioning the ceramic deck. New deck must be conditioned (pre-dried) prior to first use. • Handling the Ceramic Deck: If deck is struck against hard surface before, during or after installation, it can develop a full or hairline crack which may expand over time and require you to replace it. • Installing the Deck: Open the oven door and place ceramic pizza deck into the bottom with the slot on front of deck facing front of oven. Be sure the deck is firmly set in place. Do not force or wedge it (fig. 2). SLOT (fig. 2) • Conditioning the Deck: Pre-dry ceramic deck by carefully following instructions in the following section, BEFORE USING YOUR PIZZA OVEN. NOTE: Failure to follow conditioning instructions will cause deck to crack or warp and will void warranty. 9