Weider 3000 Instruction Manual - Page 12
Locate the High Cable 55.
View all Weider 3000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 12 highlights
18. Locate the Low Cable (53). Route the Cable 18 through the Leg Lever (8) and the Front Leg (7). Attach a 90mm Pulley (48) inside of the Leg Lever (8), over the Low Cable (53), with an M10 x 67mm Bolt (71), two M10 Washers (57), two 12mm Spacers (52), and an M10 Nylon Locknut (56). 8 56 52 57 53 48 7 57 52 71 19. Attach a 90mm Pulley (48) inside of the Front Leg 19 (7), over the Low Cable (53), with an M10 x 67mm Bolt (71), two M10 Washers (57), two 12mm Spacers (52), and an M10 Nylon Locknut (56). 57 56 52 48 7 53 57 52 71 20. Route the Low Cable (53) under a 90mm Pulley 20 (48) and through the Upright (3). Attach the Pulley inside of the Upright with an M10 x 67mm Bolt (71), two M10 Washers (57), two 12mm Spacers (52), and an M10 Nylon Locknut (56). 56 52 57 48 53 3 57 52 71 21. Route the Low Cable (53) over a 90mm Pulley (48). Attach the Pulley and two Half Finger Guards (43) to the Double "U"-bracket (63) with an M10 x 46mm Bolt (81) and an M10 Nylon Locknut (56). Make sure the Finger Guards are on the outside of the "U"-bracket as shown. 21 56 43 53 12 63 48 43 81 22. Route the Low Cable (53) under a 90mm Pulley 22 (48). Attach the Pulley and two Half Finger Guards (43) to the Base (1) with an M10 x 46mm Bolt (81) and an M10 Nylon Locknut (56). Make sure the Finger Guards are on the outside of the bracket as shown. 43 56 53 48 81 1 43 23. Attach the Low Cable (53) to the "U"-bracket (45) 23 with an M8 Washer (59) an an M8 Nylon Locknut (58). See the inset drawing. Do not overtighten the Locknut; it should be threaded onto the end of the Cable so that only two threads are showing above the nut. 45 24. Locate the High Cable (55). Route the Cable up 24 through the Top Frame (4) and over a 90mm Pulley (48). Attach the Pulley inside of the Top Frame with an M10 x 67mm Bolt (71), two M10 Washers (57), two 12mm Spacers (52), and an M10 Nylon Locknut (56). 58 58 45 59 53 53 57 56 52 55 4 48 52 71 57 25. Route the High Cable (55) over a 90mm Thin 25 Pulley (47) and down through the Top Frame (4). Attach the Pulley inside of the Top Frame with an M10 x 67mm Bolt (71), an M10 Washer (57), and an 11mm Spacer (49). Make sure that the Pulley does not fall out of the Top Frame while completing steps 26 and 27. 47 55 4 49 57 71 13