Weider Pro 300 English Manual - Page 8
up Bar 1. Attach the Pull-up Bar to the Uprights
View all Weider Pro 300 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 8 highlights
6. Orient the Left Dip Arm (4) as shown, so that the 6 large hole is on top. Attach the Left Dip Arm to the left Upright (2) with a 3/8" x 2.85" Bolt (23), two 3/8" Washers (18), and a 3/8" Nylon Locknut (19). Do not tighten the Nylon Locknut yet. Attach the Left Dip Arm (4) to the left Upright Base (3) with two 3/8" x 3/4" Bolts (22) and two 3/8" Washers (18). Do not tighten the Bolts yet. Repeat this step with the Right Dip Arm (not shown). 7. Orient the Top Crossbar (6) with the bracket on 7 the side shown. Attach the Top Crossbar to each Dip Arm (4, 25) with two 3/8" x 2.85" Bolts (23), four 3/8" Washers (18), and two 3/8" Nylon Locknuts (19). Do not tighten the Nylon Locknuts yet. Large Hole 19 18 2 4 22 18 23 3 18 22 18 23 Bracket 6 18 23 18 19 18 4 25 8. Slide a Handgrip (12) onto each end of the Pull- 8 up Bar (1). Attach the Pull-up Bar to the Uprights 2 (2) with two 3/8" x 2" Bolts (21) and two 3/8" Washers (18). 2 Tighten all of the Bolts and Nylon locknuts used in steps 2-8. 12 1 12 18 21 18 21 9. Attach a Handle (8) to each Dip Arm (4, 25) with 9 a 3/8" x 3/4" Bolt (22) and a 3/8" Washer (18). Slide a Handgrip (12) onto each Handle. 12 Slide a Bushing (13) and a Handgrip (12) onto 12 each Dip Arm (4, 25). 8 4 25 13 18 22 8