Whirlpool GXW7330DXS Installation Guide - Page 7
Installation Instructions - canopy range hood
View all Whirlpool GXW7330DXS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 7 highlights
INSTALLATION INSTRUCTIONS Prepare Location ■ It is recommended that the vent system be installed before hood is installed. 9. Drill 4.8 mm) pilot holes at all locations where screws are being installed into wood. ■ Before making cutouts, make sure there is proper clearance within the ceiling or wall for exhaust vent. ■ Check your ceiling height and the hood height maximum before you select your hood. 1. Disconnect power. 10. Install the 2 - 5 x 45 mm mounting screws. Leave a ¹⁄₄" (6.4 mm) gap between the wall and the back of the screw head to slide range hood into place. ¹⁄₄" (6.4 mm) 2. Determine which venting method to use: roof, wall, or nonvented. 3. Select a flat surface for assembling the range hood. Place covering over that surface. Vent Cover Support Bracket Installation WARNING Excessive Weight Hazard Use two or more people to move and install range hood. Installations using telescoping upper and lower vent cover assembly 1. Position vent cover bracket on wall about ¹⁄₈" (3.0 mm) away from the ceiling. 2. Mark the hole locations. Failure to do so can result in back or other injury. 3. Drill ³⁄₈" (9.5 mm) holes for wall anchors and insert anchors flush with the wall. 4. Using 2 or more people, lift range hood onto covered surface. A C Range Hood Mounting Screws Installation 5. Determine and mark the centerline on the wall where the canopy hood will be installed. 6. Select a mounting height between a minimum of 24" (61.0 cm) for an electric cooking surface, a minimum of 27" (68.6 cm) for a gas cooking surface, and a suggested maximum of 36" (91.4 cm) above the range to the bottom of the hood. Mark a reference line on the wall. 7. Tape template in place, aligning the template centerline and bottom of template with hood bottom line and with the centerline marked on the wall. B D A. 8 x 40 mm drywall anchors B. Centerline on wall C. Vent cover support bracket D. 5 x 45 mm screws 4. Attach vent cover support bracket to wall. Complete Preparation A DRILL2 (TW O)3/16"PILOT HOLES THROUGH STUDS OR REAR W ALLSUPPORT Vertical Centerline REAR W ALL M OUNTING TEM PLATE HorizontalLine CL ALIGN BOTTOM EDGE W ITH PENCILLINE INDICATING BOTTOM OFTHE HOOD Installation Height B C A. Centerline B. Fastener locations C. Mounting height reference 1. Determine and make all necessary cuts in the wall for the vent system. Install the vent system before installing the hood. See "Venting Requirements" section. 2. Determine the required height for the home power supply cable and drill a 1¼" (3.2 cm) hole at this location. 3. Run the home power supply cable according to the National Electrical Code or CSA Standards and local codes and ordinances. There must be enough ½" conduit and wires from the fused disconnect (or circuit breaker) box to make the connection in the hood's electrical terminal box. NOTE: Do not reconnect power until installation is complete. 4. Use caulk to seal all openings. 8. Mark centers of the fastener locations through the template to the wall. IMPORTANT: All screws must be installed into wood. If there is no wood to screw into, additional wall framing supports may be required. Remove the template. 7