Whirlpool WED92HEFC Installation Guide - Page 4
Installation Requirements - stacking kit
View all Whirlpool WED92HEFC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 4 highlights
INSTALLATION REQUIREMENTS TOOLS AND PARTS Gather the required tools and parts before starting installation. Tools needed for all installations: Tools needed for gas installations: 8" or 10" pipe wrench 8" or 10" adjustable wrench (for gas connections) Flat-blade screwdriver #2 Phillips screwdriver ¼" and 5/16" nut driver (recommended) Level Pipe-joint compound resistant to LP gas Parts supplied (all models): Tape measure Pliers Utility knife Tin snips (new vent installations) Leveling legs (4) Parts supplied (steam models): "Y" connector 2' (0.6 m) inlet hose Caulking gun and compound (new vent installations) Adjustable wrench that opens to 1" (25 mm) or hex-head socket wrench Rubber washer Parts package is located in dryer drum. Check that all parts are included. NOTE: Do not use leveling legs supplied with dryer if installing with a pedestal or a stack kit. Parts needed: (Not supplied with dryer) ■■Vent clamps ■■Vent elbows and vent work 4