Whirlpool WGD72HEDW Installation Guide - Page 4

Installation Requirements - pedestal

Page 4 highlights

INSTALLATION REQUIREMENTS TOOLS AND PARTS Gather the required tools and parts before starting installation. Tools needed for all installations: Parts supplied (all models): Flat-blade screwdriver #2 Phillips screwdriver Leveling legs (4) Parts supplied (steam models): 1/4" and 5/16" nut driver (recommended) Level "Y" connector 2' (0.6 m) inlet hose Tape measure Utility knife Pliers Rubber washer Tin snips (new vent installations) Parts package is located in dryer drum. Check that all parts are included. NOTE: Do not use leveling legs supplied with dryer if installing with a pedestal or a stack kit. Parts needed: (Not supplied with dryer) ■■Vent clamps ■■Vent elbows and vent work Parts needed (steam models): Caulking gun and compound Adjustable wrench that opens to (new vent installations) 1" (25 mm) or hex-head socket wrench Tools needed for gas installations: 5' (1.52 m) inlet hose 8" or 10" pipe wrench 8" or 10" adjustable wrench (for gas connections) Additional parts may be required, depending in your installation. Check local codes. Check existing electrical supply and venting. Read "Electrical Requirements" and "Venting Requirements" before purchasing parts. Optional Equipment: (Not supplied with dryer) Refer to your Use and Care Guide for information about accessories available for your dryer. Pipe-joint compound resistant to LP gas 4

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44

4
INSTALLATION REQUIREMENTS
TOOLS AND PARTS
Gather the required tools and parts before starting installation.
Tools needed for all installations:
Level
Tape measure
Pliers
Flat-blade screwdriver
#2 Phillips screwdriver
Adjustable wrench that opens to
1" (25 mm) or hex-head socket wrench
Tin snips (new vent installations)
Caulking gun and compound
(new vent installations)
1/4" and 5/16" nut driver
(recommended)
Leveling legs (4)
Tools needed for gas installations:
8" or 10" pipe wrench
8" or 10" adjustable wrench
(for gas connections)
Pipe-joint compound
resistant to LP gas
Utility knife
“Y” connector
Parts package is located in dryer drum. Check that all parts
are included.
NOTE:
Do not use leveling legs supplied with dryer if installing
with a pedestal or a stack kit.
Additional parts may be required, depending in your installation.
Check local codes. Check existing electrical supply and venting.
Read “Electrical Requirements” and “Venting Requirements”
before purchasing parts.
Optional Equipment:
(Not supplied with dryer)
Refer to your Use and Care Guide for information about
accessories available for your dryer.
Parts supplied (all models):
Parts supplied (steam models):
2' (0.6 m) inlet hose
5' (1.52 m) inlet hose
Parts needed (steam models):
Parts needed:
(Not supplied with dryer)
Vent clamps
Vent elbows and vent work
Rubber washer