Acer Altos G310 MK2 User Manual - Page 136

SCSI RAID HBA setup, Serial ATA ports

Page 136 highlights

124 P package contents 23 Post-installation instructions 30 Preinstallation instructions 30 Preinstallation requirements 23 Processor 3 Product 3 Product specifications 7 Q quick configuration steps Configuration Utility 105 R RAID 0 number of drives 106 RAID 1 number of drives 106 RAID 10 number of drives 106 RAID levels assigning 104 Rear panel 18 REBLD 113 rebuild 112 rebuilding drives 112 removing the front panel 33 removing the side panel 32 S SCSI HBA setup 119 SCSI RAID HBA 117, 119 SCSI RAID HBA setup 119 selecting Configuration Utility 106 Serial ATA ports 4 size logical drive 110 Storage 4 stripe size 107 system boards mainboard layout 11 system upgrade 29 ESD precautions 29 post-installation instructions 30 preinstallation instructions 30 T turning off the system 25 turning on the system 24 power-on problems 25, 34 U Upgrading the CPU 36 Upgrading the system 29 V view/add configuration 109

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136

124
P
package contents
23
Post-installation instructions
30
Preinstallation instructions
30
Preinstallation requirements
23
Processor
3
Product
3
Product specifications
7
Q
quick configuration steps
Configuration Utility
105
R
RAID 0
number of drives
106
RAID 1
number of drives
106
RAID 10
number of drives
106
RAID levels
assigning
104
Rear panel
18
REBLD
113
rebuild
112
rebuilding drives
112
removing the front panel
33
removing the side panel
32
S
SCSI HBA setup
119
SCSI RAID HBA
117,
119
SCSI RAID HBA setup
119
selecting
Configuration Utility
106
Serial ATA ports
4
size
logical drive
110
Storage
4
stripe size
107
system boards
mainboard layout
11
system upgrade
29
ESD precautions
29
post-installation instructions
30
preinstallation instructions
30
T
turning off the system
25
turning on the system
24
power-on problems
25,
34
U
Upgrading the CPU
36
Upgrading the system
29
V
view/add configuration
109