Acer Aspire 5230 Aspire 5230 Service Guide - Page 95

Removing the Switch Board

Page 95 highlights

Removing the Switch Board 1. See "Removing the Upper Cover" on page 70. 2. Remove the single securing screw. Step Switch Board Size M2.5*4 (NL) Quantity 1 3. Lift the switch board and FFC up and away from the upper cover. Screw Type Chapter 3 83

We apologize, but we cannot currently deliver this PDF manual by request of the manufacturer.

We apologize for any inconveniece.