Acer Aspire Z1100 Acer Aspire Z1100 Desktop Service Guide - Page 116
Mainboard Installation
View all Acer Aspire Z1100 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 116 highlights
Mainboard Installation 0 NOTE: NOTE: Make sure all cables are clear when installing mainboard. 1. Align and install mainboard to guidepins (Q) on middle frame. (Figure 3-41) 2. Install and secure screws (P) to middle frame. 3. Connect the following cables: (Figure 3-42) Button board cable (H) to mainboard connector (h) Fan cable (J) to mainboard connector (j) ODD cable (K) to mainboard connector (k) LVDS cable (M) to mainboard connector (m) Camera cable (N) to mainboard connector (n) Function board cable (G) to mainboard connector (g) 4. Connect the following cables: (Figure 3-41) Right light bar cable (C) to mainboard connector (c) Speaker cable (B) to mainboard connector (b) Infrared board cable (A) to mainboard connector (a) Left light bar cable (D) to mainboard connector (d) Power board cable (E) to mainboard connector (e) Converter board cable (F) to mainboard connector (f) 5. Install CPU, Thermal Module, RTC Battery, WLAN Module, DIMM Modules and TV Tuner Module. ID Size P M3.0x5.0 Quantity 2 Screw Type 3-46 Machine Maintenance Procedures