Asus ESC4000 FDR G2 Cache Vault Accessory Kit Quick Start Guide - Page 7

Installing the kit on ESC4000 G2 GPU server system

Page 7 highlights

2. Align the three screw holes on the LSI® steel CVPM clip to the three screw holes on the bracket, and secure the clip with the bundled screws (4). 3. Install the Cache Vault Power Module to the clip and connect the 42'' cable extender to it. 4. Connect the other end of the 42'' cable extender to the Cache Vault Flash Module which is installed on the PIKE 2208 card. 5. Install the PIKE 2208 card to the expansion slot, and then install the bracket to the system as shown. Wrap the excessive part of the cable and place it into the gap beside the PIKE 2208 card. PIKE 2208 card For more details on how to uninstall the riser card bracket, refer to the user manual that came with your server system. Installing the kit on ESC4000 G2 GPU server system 1. Align the two screws on the side of the steel CVPM holder installed with the Cache Vault Power Module to the screw holes of the full-height steel bracket. Secure the holder assembly with the bundled screws (3). Cache Vault Accessory Kit 

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16

Cache Vault Accessory Kit
2.
Align the three screw holes on the
LSI® steel CVPM clip to the three
screw holes on the bracket, and
secure the clip with the bundled
screws (4).
3.
Install the Cache Vault Power
Module to the clip and connect the
42’’ cable extender to it.
4.
Connect the other end of the 42’’
cable extender to the Cache Vault
Flash Module which is installed on
the PIKE 2208 card.
5.
Install the PIKE 2208 card to the
expansion slot, and then install the
bracket to the system as shown.
Wrap the excessive part of the
cable and place it into the gap
beside the PIKE 2208 card.
PIKE 2208 card
For more details on how to uninstall the riser card bracket, refer to the user
manual that came with your server system.
Installing the kit on ESC4000 G2 GPU server system
1.
Align the two screws on the side of
the steel CVPM holder installed with
the Cache Vault Power Module to the
screw holes of the full-height steel
bracket. Secure the holder assembly
with the bundled screws (3).
7