Brother International BE-1201B-AC Maintenance Schedule - English - Page 5
Greasing
View all Brother International BE-1201B-AC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 5 highlights
BAS-416,416A,1210 BE-901,916,1201,1216 For Technical Assistance Please Call Toll Fre e 1-877-4BROTHER Email: [email protected] Website: http://www.brother-usa.com/industembroidery/tech_down.aspx 6 Month Maintenance Greasing X Linear Rail Y Linear Rails 1. Looking up underneath the pantograph you will 1. Push the pantograph slowly to the back. Apply see the X linear rail. white grease (30) to the two grooves of the linear rails on boththe left and right side of the machine. 2. Apply white grease (30) to the two grooves of the linear rail its entire length. This will be made easier by slowly moving the pantograph all the way to the right to grease the left side and vice versa for the right side. 2. Push the pantograph slowly to the front. Apply white grease (30) to the two grooves of the linear rails on boththe left and right side of the machine. 9/1/05 5