Brother International BES-960BC Instruction Manual - English - Page 25
Installation of Machine, The leveling plates
View all Brother International BES-960BC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 25 highlights
Chapter 2 Preparation of Embroidery Machine 2-2 Installation of Machine r q e w 1. Place the attached cushion sheets w and leveling plates e under the four level adjusters q. The leveling plates e should be placed above the cushion sheets respectively. 2. Secure the four level adjusters q on the ground using the nuts r so that the machine will be stable. Note) If the floor is not strong enough, the embroidery machine may be rocked during operation. In such a case, it is recommended that a secure base of concrete be placed below the embroidery machine. 30 BES-960BC • BES-1260BC
Chapter 2
Preparation of Embroidery Machine
BES-960BC
•
BES-1260BC
30
2-2 Installation of Machine
1.
Place the attached cushion sheets
w
and
leveling plates
e
under the four level
adjusters
q
.
The leveling plates
e
should
be placed above the cushion sheets
respectively.
2.
Secure the four level adjusters
q
on the
ground using the nuts
r
so that the
machine will be stable.
Note)
If the floor is not strong enough, the embroi-
dery machine may be rocked during opera-
tion.
In such a case, it is recommended that a
secure base of concrete be placed below the
embroidery machine.
r
q
e
w