Cisco 7937G Administration Guide - Page 41
Procedure, Notes, Reference, - cables
UPC - 882658165283
View all Cisco 7937G manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 41 highlights
Chapter 3 Setting Up the Conference Station Installing the Conference Station To install a conference station using PoE, perform the following steps: Procedure Notes Reference 1. Connect the end (without a ferrite bead) of a Category 5 Each conference station ships See the "Network Ports" straight-through Ethernet network cable to the LAN port on with one Ethernet cable in the section on page 3-3 for the underside of a conference station. box. guidelines. 2. Connect the other end (with a ferrite bead) of a Category 5 straight-through Ethernet network cable to a LAN port. See the "Network Ports" section on page 3-3 for guidelines. Figure 3-2 shows how to connect the conference station to the network if you use an optional external power supply. Figure 3-2 Conference Station Cable Connections Using Optional External Power Supply 4 3 5 2 6 1 7 8 185258 1 Connection of network cable to conference station RJ-45 port 2 Network cable (25-foot) 3 Connection of network cable to the power interface cable 4 Power interface cable 5 Connection of power interface cable to LAN wall port 6 Connection of power interface cable to external power supply 7 External power supply 8 Connection of external power supply to wall outlet Cisco Unified IP Conference Station 7937G Administration Guide for Cisco Unified Communications Manager 6.0 OL-11560-01 Rev. B0 3-5