Cisco SFS-7012 User Guide - Page 36
Installation Tasks Checklist, Safety Information
View all Cisco SFS-7012 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 36 highlights
Chapter Installation Tasks Checklist To perform the actual switch installation, the site implementation engineer must perform the following tasks, which are detailed in this section. Caution Be sure to review the Safety Information on page 18 before starting the installation and during the installation process. Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 Check the installation site to verify the installation of cabinet power feeds, rails, and grounding. Unpack the equipment and inspect for any shipping damage. Any shipping damage should be reported to the shipping company. Verify that the equipment serial numbers match those on the packing slip. Mark the rack and install the mounting rails. Physically install the switch in the rack. Install IB cables between the SFS 7012 and other IB-enabled network devices. Install intra-cabinet power and grounding cables for the switch. Power up the switch. Verify the default system IP address (192.168.100.9) Add the equipment to the network. Safety Information The following safety guidelines are provided to ensure both personal safety for the user and to protect the system from potential damage. These precautions cover the following categories: • Precautions for Rack-Mountable Products • Protecting Against Electrostatic Discharge • Electrical Safety Precautions Precautions fit into one of three categories: Note A textual callout designed to emphasize: - Tasks of particular importance. - Tips and reminders to maximize the use of the equipment. Caution Potential for damage to system equipment. Damage to the system caused by the user may have potential warranty implications. Warning Potential for personal injury. Cisco SFS 7012 InfiniBand Server Switch Hardware Users Guide 18 OL-8787-04