Dell PowerEdge 2950 Rack Installation Guide - Page 10
Installation Tasks, Installing the mounting rails in the rack - rail kit
View all Dell PowerEdge 2950 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 10 highlights
Figure 1-1. Rack Kit Contents 1 3 2 4 6 5 1 cable-management arm 4 slide assemblies 2 left cable-management arm ramp assembly 5 10-32 x 0.5-inch flange-head Phillips screws (8) 3 right cable-management arm ramp assembly 6 status indicator cable (if applicable) Installation Tasks Installing a rack kit involves performing the following tasks (described in detail in subsequent sections) in their numbered order: 1 Removing the rack doors 2 Marking the rack 3 Configuring the sliding rail assemblies 4 Installing the mounting rails in the rack • RapidRails installation • VersaRails installation 5 Installing the system in the rack 6 Installing the cable-management arm 7 Routing cables 8 Attaching the cable-management arm ramp assembly 9 Replacing the rack doors 8 Rack Installation Guide