Fisher and Paykel DD24SI7 BOOK INSTL VENT FRAME FP USA (English, French) - Page 2
Integrated Models Only - Preparation For External Venting Through Adjacent Cabinet
View all Fisher and Paykel DD24SI7 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 2 highlights
1a INTEGRATED MODELS ONLY - PREPARATION FOR EXTERNAL VENTING THROUGH SAME CABINET 2 Services can be located either side of dishwasher VENT HOSE ø 2 3⁄8" (60 mm) ø max. 1½"(38 mm) Important! Ensure you do not cut through the toekick below Shelf cutouts max. 3⁄16" (5 mm) ø 2 3⁄8" (60 mm) 4" (100 mm) Important! Ensure any bare wood on exposed frames is adequately sealed to withstand moisture (ie moisture-proof polyurethane) DRAIN HOSE + INLET HOSE + POWER CORD Frame 8 11⁄16" (220 mm) 1" (25 mm) 1b INTEGRATED MODELS ONLY - PREPARATION FOR EXTERNAL VENTING THROUGH ADJACENT CABINET Services can be located either side of dishwasher If the services holes are through metal, ensure you fit the supplied Edge Protector around the hole for the power cord. ø 2 3⁄8" 60mm The ø 2 3⁄8" (60 mm) services hole for the hoses should be enlarged to accomodate the extra venting hose by cutting out some material from the bottom corner. VENT HOSE + DRAIN HOSE + INLET HOSE ø max. 1½" (38 mm) ø 2 3⁄8" (60 mm) POWER CORD Important! Ensure you do not cut through the toekick below Shelf cutouts max. 3⁄16" (5 mm) ø 2 3⁄8" (60 mm) 4" (100 mm) 8 11⁄16" (220 mm) Important! Ensure any bare wood on exposed frames is adequately sealed to withstand moisture (ie moisture-proof polyurethane) Frame 1" (25 mm)