Fluke P5514B-2700G-1 Product Manual - Page 8
Operation
View all Fluke P5514B-2700G-1 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 8 highlights
P5514B-70M/P5514B-70M-EP Users Manual Operation Priming Follow these steps: 1. Open the reservoir valve one turn counter clockwise and turn screw press fully in. 2. Close the valve and turn screw press fully out. 3. Open the valve and turn screw, press fully in. Note During this operation, bubbles can appear in the reservoir as trapped air is expelled. For large volumes, repeat steps 2 and 3 until no further bubbles appear. 4. With the valve open, turn screw press fully out and close valve. The test pump is now ready for use. WWarning Turning the capstan out with the reservoir valve closed generates approximately 15 inHg / 0.5 bar vacuum. If the DUT is vacuum sensitive, leave valve (13) open during priming operation. Pressure Operation Follow these steps: 1. Turn the screw press in to generate pressure. 2. Allow a few moments for the system to stabilize before taking any readings, especially after large changes in system pressure. Note Large, sudden changes in pressure will cause the system temperature to rise or fall, which can cause instrument readings to change as the fluid in the system expands or contracts, thus increasing or decreasing the pressure. 3. Use the fine adjustment control on the side of the manifold to make precise adjustments to the pressure. 4. Compare the reading of the gauge under test with that of the master gauge. 5. For the next higher calibration point, repeat from Priming, step 1. 6. To measure reducing pressures, turn the screw press out (counter-clockwise). 7. Depressurize the system by turning the screw press FULLY OUT, then open the reservoir valve. 4 MyFlukeStore Shop for Fluke products online at: www. .com 1.888.610.7664