Gateway 7400 Rackmount Installation Guide - Page 16

Attach the second screw to the front mounting bracket by repeating

Page 16 highlights

3 Align the front of the cabinet mounting rail to the front mounting bracket by sliding the inner rail and inner slide until the rail screw hole opening lines up with one of the front mounting bracket screw holes. Inner rail Inner slide Front vertical mounting rail Spring latch Cabinet mounting rail Back vertical mounting rail 4 Attach the front of the cabinet mounting rail to the front mounting bracket using a screw from the accessory kit. 5 Attach the second screw to the front mounting bracket by repeating Steps 3 and 4. 6 Mount the second cabinet mounting rail on the opposite side of the cabinet by repeating Steps 1 through 5. 7 Go to "Mounting the system drawer in the cabinet" on page 15. Installing the cabinet mounting brackets and mounting rails 11

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

Installing the cabinet mounting brackets and mounting rails
11
3
Align the front of the cabinet mounting rail to the front mounting
bracket by sliding the inner rail and inner slide until the rail screw hole
opening lines up with one of the front mounting bracket screw holes.
4
Attach the front of the cabinet mounting rail to the front mounting
bracket using a screw from the accessory kit.
5
Attach the second screw to the front mounting bracket by repeating
Steps 3 and 4.
6
Mount the second cabinet mounting rail on the opposite side of the
cabinet by repeating Steps 1 through 5.
7
Go to
Mounting the system drawer in the cabinet
on page 15.
Inner rail
Inner slide
Front vertical
mounting rail
Cabinet mounting rail
Back vertical
mounting rail
Spring latch