Haier AB092FCAIA User Manual - Page 10

Selection of Installation Place, Installation Preparation

Page 10 highlights

Installation Procedures 1.Selection of Installation Place (1) Place above the ceiling where have enough space to arrange the unit. (2) Place where the drainage pipe can be arranged well. (3) Place where inlet and outlet air of indoor and outdoor unit will not be blocked. (4) Do not expose the unit to the place with heavy oil or moisture (e.g.kitchen and workshop). (5) Do not set the unit in the place where destructive gas (such as sulfuric acid gas) or pungent gas (thinner and gasoline) concentrates and retains. (6) Place strong enough to support the unit weight. (7) No expensive articles such as television and piano below indoor unit. (8) Enough space for maintenance. (9) Place more than 1m away from television and radio to avoid disturbing television and radio. (10) Easy for maintenance. H 0.31m 1.5m Air outlet Air inlet Air outlet 1.5m 2.5m Over (do not exceed 2.7m) 2.Installation Preparation (1) Position of ceiling opening between unit and suspending bolt (front view of unit). Indoor unit 570mm Ceiling opening 650mm Ornament panel 700mm Overlap between ceiling and ornament panel shall be 25mm Suspending bolts 150mm 320mm 60mm Distance between suspending bolts 535mm Indoor unit 570mm Ceiling opening 650mm Ornament panel 700mm Ceiling Ornament panel (2) Prepare all piping (refrigerant,water drainage )and wires (connection wire of remote controller, indoor unit connection wires) to the indoor unit before installation in order to connect indoor unit immediately after installation. 12 Maintenance Seasonal Reserve Post-season Care Operate the unit with FAN mode on a fair day for about half a day to dry the inside of the unit well. Stop operation and turn off the power supply switch .Electric power is consumed even the air conditioner is in stop. Clean the air filter, indoor unit and outdoor unit,and cover the unit with dustcoat. Pre-season Care See that there is no obstacle blocking the air inlet and air outlet of both indoor and outdoor unit to avoid reduce the working efficiency. Be sure to install the air filter, ensure that the air filter is not dirty. Otherwise may result in machine damages or cause malfunciton due th dust inside the unit To protect compressor when start in HEAT mode, please cut in the power supply switch 12 hours before starting run,furthermore, always keep the power supply switch on during the using senson. 9

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11

9
Seasonal Reserve
Operate the unit with FAN mode on a fair day for about half
a day to dry the inside of the unit well.
Stop operation and turn off the power supply switch .Electric
power is consumed even the air conditioner is in stop.
Clean the air filter, indoor unit and outdoor unit,and cover
the unit with dustcoat.
Pre-season Care
See that there is no obstacle blocking the air
inlet and air outlet of both indoor and outdoor
unit to avoid reduce the working efficiency.
Be sure to install the air filter, ensure that the air filter is not dirty. Otherwise may result in
machine damages or cause malfunciton due th dust inside the unit
To protect compressor when start in HEAT mode,
please cut in the power supply switch 12 hours
before starting run,furthermore, always keep the
power supply switch on during the using senson.
Post-season Care
Maintenance
12
1.Selection of Installation Place
(1) Place above the ceiling where have enough space to arrange the unit.
(2) Place where the drainage pipe can be arranged well.
(3) Place where inlet and outlet air of indoor and outdoor unit will not be blocked.
(4) Do not expose the unit to the place with heavy oil or moisture (e.g.kitchen and workshop).
(5) Do not set the unit in the place where destructive gas (such as sulfuric acid gas) or pungent
gas (thinner and gasoline) concentrates and retains.
(6) Place strong enough to support the unit weight.
(7) No expensive articles such as television and piano below indoor unit.
(8) Enough space for maintenance.
(9) Place more than 1m away from television and radio to avoid disturbing television and radio.
(10) Easy for maintenance.
2.Installation Preparation
(1) Position of ceiling opening between unit and suspending bolt (front view of unit).
(2) Prepare all piping (refrigerant,water drainage )and wires (connection wire of remote controller,
indoor unit connection wires) to the indoor unit before installation in order to connect indoor unit
immediately after installation.
Overlap between ceiling and
ornament panel shall be 25mm
Suspending bolts
Ceiling
Ornament panel
150mm
320mm
60mm
Air outlet
Air outlet
Air inlet
2.5m Over (do not exceed 2.7m)
Distance between
suspending bolts 535mm
Indoor unit
570mm
Ceiling opening 650mm
Ornament panel 700mm
Indoor unit 570mm
Ceiling opening 650mm
Ornament panel 700mm
Installation Procedures
1.5m
1.5m
0.31m
H