Haier AB092FCAIA User Manual - Page 3

Installation Procedures,Check and Test Run - appliances

Page 3 highlights

Cautions All electrical repairs must be carried out by qualified electricians. Inadequate repairs may result in a major source of danger for the user of the air conditoiner. Do not damage any parts of the air conditioner that carry refrigerant by piercing or perforating the air conditioner's tubes with sharp or pointed items, crushing or twisting any tubes, or scraping the coatings off the surfaces. If the refrigerant spurts out and gets into eyes, it may result in serious eye injuries. Do not obstruct or cover the ventilation grille of the air conditioner. Do not put fingers or any other things into the inlet/outlet and swing louver. Do not allow children to play with the air conditioner. In no case should children be allowed to sit on the outdoor unit. 2. If the supply cord is damaged, it must be replaced by the manufacturer or its service agent or a similar qualified person. 3. If the fuse on PC board is broken please change it with the type of T3.15A /250VAC. 4. The wiring method should be in line with the local wiring standard. 5. Use copper wire only. The connecting cable should be H05RN-F 4G 0.75mm2 . The power cable should be H05RN-F 3G 2.5mm2 . All the cables shall have got the European authentication certificate. 6. The waste battery shall be disposed properly. 7. The indoor unit installation height is at least 2.5m. 8. The appliance must be installation that the plug should be easily accessible after installation. 9. The power plug should be self-provided and it should have got the Local authentication certificate. Specifications The refrigerating circuit is leak-proof. The machine is adaptive in following situation 1. Applicable ambient temperature range: Rated Maximum Minimum DB C 27 32 18 Indoor Cooling WB C 19 23 14 outdoor DB C 35 43 -5 WB C 24 26 -- Indoor DB C 20 27 15 Heating WB C 14.5 -- -- outdoor DB C 7 WB C 6 21 -15 15 -- 2 Installation Procedures,Check and Test Run Other Instructions 1.Configuration of power supply Air conditioner must use special power supply system (above 20A), and qualified electrician makes wiring and fixing according to wiring regulations specified in national standard. In socket, exactly distinguish earth wire with neutral wire and it is wrong to connect them together. A leakage breaker must be installed. Parameters of power supply: H07RN-F 3G 2.0mm2 Connection method is Y-connection .If the power cord is damaged, it must be replaced by professional people of manufacturer or its maintenance department or similar to avoid dangers. 2.Pipe cutting and expanding Must remove burrs if cut pipes with pipe cutter. Expand flare after insert the pipe expander. Diameter of pipe Dimension A (mm) Liquid pipe 6.35mm (1/4î) 1.0~1.2 Gas pipe 12.7mm (1/2î) 1.4~2.2 A Pipe expander Correct Incorrect Deflection Crack occurs Broken Incomplete Over outward Installation check and test run Require customers to use air conditioner according to the operation manual. The items checked during test run,please mark in No gas leakage on the pipe joint ? How about the thermal insulation of the pipe joint: Is the electrical wiring between indoor and outdoor unit connected to the terminal block firmly? Is the wiring of indoor and outdoor unit secured firmly? Is the drainage hose arranged correct? Is the earthing wire connected firmly? Is the power supply voltage conformed to the electrical regulation? Any noise? Is the display on the control board (LCD) correct? Cooling normal? Does the indoor temperature regulator work normally? For the power supply L shall be connected to the live wire. N shall be connected to the neutral wire. Shall be connected to the earth wire. Trial Operation The person who has completed this installation shall be requested to conduct a test operation for check: Is the temperature adjuster working normally? Does the location for installation conform to requirements? Winding up with Protective Plastic Tape The connection pipes, drain pipe, and the connection wires shall be wound up with PVC tape. Notes: The connection pipes shall also be wound up with insulating material to preserve the temperature. The airing direction shall be from bottom to top. 19

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11

2
All electrical repairs must be carried out
by qualified electricians. Inadequate repairs
may result in a major source of danger for
the user of the air conditoiner.
Do not damage any parts of the air
conditioner that carry refrigerant by
piercing or perforating the air conditioner's
tubes with sharp or pointed items, crushing
or twisting any tubes, or scraping the
coatings off the surfaces. If the refrigerant
spurts out and gets into eyes, it may result
in serious eye injuries.
Do not obstruct or cover the ventilation
grille of the air conditioner. Do not put
fingers or any other things into the
inlet/outlet and swing louver.
Do not allow children to play with the air
conditioner. In no case should children be
allowed to sit on the outdoor unit.
Specifications
The refrigerating circuit is leak-proof.
1. Applicable ambient temperature range:
The machine is adaptive in following
situation
2. If the supply cord is damaged, it must be
replaced by the manufacturer or its service
agent or a similar qualified person.
3. If the fuse on PC board is broken please
change it with the type of
T3.15A /250VAC.
Cautions
Cooling
Heating
Indoor
outdoor
Rated Maximum Minimum
27
32
18
19
23
14
35
43
-5
24
26
--
20
27
15
14.5
--
--
7
21
-15
6
15
--
DB
C
WB
C
DB
C
WB
C
Indoor
outdoor
DB
C
WB
C
DB
C
WB
C
2
2
19
Other Instructions
1.Configuration of power supply
Air conditioner must use special power supply system (above 20A), and qualified electrician makes
wiring and fixing according to wiring regulations specified in national standard.
In socket, exactly distinguish earth wire with neutral wire and it is wrong to connect them together.
A leakage breaker must be installed.
Parameters of power supply: H07RN-F 3G 2.0
mm
2
Connection method is Y-connection .If the power cord is damaged, it must be replaced by
professional people of manufacturer or its maintenance department or similar to avoid dangers.
2.Pipe cutting and expanding
Must remove burrs if cut pipes with pipe cutter.
Expand flare after insert the pipe expander.
Installation check and test run
Require customers to use air conditioner according to the operation manual.
The items checked during test run,please mark
in
No gas leakage on the pipe joint ?
How about the thermal insulation of the pipe joint:
Is the electrical wiring between indoor and outdoor unit connected to the terminal block firmly?
Is the wiring of indoor and outdoor unit secured firmly?
Is the drainage hose arranged correct?
Is the earthing wire connected firmly?
Is the power supply voltage conformed to the electrical regulation?
Any noise?
Is the display on the control board (LCD) correct?
Cooling normal?
Does the indoor temperature regulator work normally?
For the power supply
L
shall be connected to the live wire.
N
shall be connected to the neutral wire.
Shall be connected to the earth wire.
The
person
who
has
completed
this
installation
shall
be
requested
to
conduct
a test
operation
for
check:
Is
the
temperature
adjuster
working
normally?
Does
the
location
for
installation
conform
to
requirements?
Winding
up
with
Protective
Plastic
Tape
The
connection
pipes, drain
pipe, and
the
connection
wires
shall
be
wound
up
with
PVC
tape.
Notes: The
connection
pipes
shall
also
be
wound
up
with
insulating
material
to
preserve
the temperature.
The
airing
direction
shall
be
from
bottom
to
top.
Trial
Operation
Correct
Incorrect
Deflection
Crack occurs
Broken
Incomplete
Over outward
A
Pipe expander
Liquid pipe
Gas pipe
Diameter of pipe
Dimension A (mm)
1.0~1.2
1.4~2.2
6.35mm (1/4î)
12.7mm (1/2î)
Installation Procedures,Check and Test Run
4. The wiring method should be in line with
the local wiring standard.
5. Use copper wire only. The connecting cable
should be H05RN-F 4G 0.75mm
. The power
cable should be H05RN-F 3G 2.5mm
.
All the cables shall have got the European
authentication certificate.
6. The waste battery shall be disposed properly.
7. The indoor unit installation height is at least
2.5m.
8. The appliance must be installation that the
plug should be easily accessible after
installation.
9. The power plug should be self-provided and
it should have got the Local authenti-
cation certificate.