Haier AB142ACBEA User Manual - Page 26
For series 14 18
View all Haier AB142ACBEA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 26 highlights
Installation Procedure (For series 14 18 ) Check whether indoor unit is horizontal with leveler or polythene pipe filled with water , and check that the dimension of the ceiling opening is correct. Take off the lever gauge before install the ornament panel. Fasten the screws to make the height difference between the two sides of indoor unit less than 5mm. First fix it with screws temporally. Fasten the two temporally fixing screws and other two, and tighten the four screws. Connect the wires of synchro-motor. Connect the wire of signal. Drain hose Pipe Pipe If no response of remote controller, check whether the wiring is correct, restart remote controller 10 seconds after shut off power supply. Display window (For series 14 18 ) POWER SUPPLY:1PH,220-230V~,50Hz INDOOR UNIT 123 N L Y/G TERMINAL BLOCK OUTDOOR UNIT TERMINAL BLOCK 1 2 3 Y/G Install the panel board in the direction shown in the figure. The incorrect direction will result in water leakage, meanwhile swing and signal receiving are displayed that cannot be connected. Louver motor Liquid inlet pipe Drain hose Gas outlet pipe 24