Haier AB142ACBEA User Manual - Page 27
R S T
View all Haier AB142ACBEA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 27 highlights
Installation Procedure (2) Check if water drainage is smooth after installation. (For series 24 28 36 42 52 ) Charge, through air outlet or inspecting hole, 1200ccd water to see water drainage. After wiring Check water drainage in cooling operation. When wiring is not complete Remove cover of control box, connect 1PH power to terminal 1 and 2 on terminal block.,use remote controller to operate the unit. Note, in this operation, fan will be running. Upon confirmation of a smooth water drainage, be sure to cut off power supply. 1 Method of water charging Self-provided stiff pipe Maintenance Water drainage port for maintenance (Drain water from this hole) Inspecting hole Connect with outdoor unit 100mm Watering can of plastic pipe should be about 100 mm long Charge water from inspecting hole Charge water from air outlet 3 D 2 Terminal block PCB on indoor unit Terminal block Cover of controll box (For series 24) Y/G INDOOR UNIT 1 2 3 TERMINAL BLOCK L N 1 2 3 Y/G W B Y/G POWER SUPPLY: 1PH,220-230V~,50Hz (For series 28 36 42 52) INDOOR UNIT 1 2 3 TERMINAL BLOCK 0600309**** Y/G OUTDOOR UNIT TERMINAL BLOCK RSTN 1 2 3 Y/G POWER SUPPLY: 380-400V,3N~,50Hz 25