HP 3PAR StoreServ 7200 2-node HP 3PAR-to-3PAR Storage Peer Motion Guide (OS 3. - Page 15
Port Configuration and Zoning, Set Up Connections screen.
View all HP 3PAR StoreServ 7200 2-node manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 15 highlights
Port Configuration and Zoning After zoning is complete, click OK, and click Verify Configuration when your are returned to the Set Up Connections screen. If the configuration is successful, a message to that effect is displayed. If the configuration was not successful, a message that describes the issue is displayed. Creating a Peer Motion Configuration 15
Port Configuration and Zoning
After zoning is complete, click
OK
, and click
Verify Configuration
when your are returned to the
Set Up Connections screen.
If the configuration is successful, a message to that effect is displayed.
If the configuration was not successful, a message that describes the issue is displayed.
Creating a Peer Motion Configuration
15