HP Brocade BladeSystem 4/24 Brocade EZSwitchSetup Administrator's Guide v6.2.0 - Page 59
In this appendix, General limitations
View all HP Brocade BladeSystem 4/24 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 59 highlights
EZSwitchSetup Limitations Appendix A In this appendix •General limitations 47 General limitations Table 3 lists general EZSwitchSetup limitations, which apply to all browsers and switch platforms. TABLE 3 EZSwitchSetup Switch Manager Limitations Problem Area Details HTTP timeout Very often, you may see the following message when you try to get data from a switch or to send a request to the switch: Failed to get switch response. Please verify the status of your last operation and try again if necessary. This indicates that an HTTP request did not get a response. The request was sent to the switch, but the connection was down, probably caused by a temporary loss of the Web server on the switch. Due to the nature of an HTTP connection, Switch Manager will report this error after a 90-second default timeout. In this case, verify the status of your last request, using Telnet to check related status, or click the Refresh button in the Switch Manager to retrieve related data. If your request did not get through to the switch, resubmit it. Executing a refresh from Switch Manager retrieves a copy of switch data at that moment; the data you entered can be lost if it had not already been committed to the switch. EZSwitchSetup Administrator's Guide 47 53-1001193-02