HP Cisco MDS 9120 Cisco Nexus 5000 Series Hardware Installation Guide (OL-1590 - Page 104

Task No., Planning Activity, Verified By, Table D-1, Site Planning Checklist

Page 104 highlights

Site Preparation Checklist Appendix D Site Planning and Maintenance Records Send documentation comments to [email protected] Table D-1 Site Planning Checklist Task No. Planning Activity Verified By Time 1 Space evaluation: • Space and layout • Floor covering • Impact and vibration • Lighting • Maintenance access 2 Environmental evaluation: • Ambient temperature • Humidity • Altitude • Atmospheric contamination • Air flow 3 Power evaluation: • Input power type • Power receptacles1 • Receptacle proximity to the equipment • Dedicated circuit for power supply • Dedicated (separate) circuits for redundant power supplies • UPS2 for power failures 4 Grounding evaluation: • Circuit breaker size • CO ground (AC- powered systems) 5 Cable and interface equipment evaluation: • Cable type • Connector type • Cable distance limitations • Interface equipment (transceivers) 6 EMI3 evaluation: • Distance limitations for signaling • Site wiring • RFI4 levels 1. Verify that the power supply installed in the chassis has a dedicated AC source circuit. 2. UPS = uninterruptible power supply. Date Cisco Nexus 5000 Series Hardware Installation Guide D-2 OL-15902-01

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112

Send documentation comments to [email protected]
D-2
Cisco Nexus 5000 Series Hardware Installation Guide
OL-15902-01
Appendix D
Site Planning and Maintenance Records
Site Preparation Checklist
Table D-1
Site Planning Checklist
Task No.
Planning Activity
Verified By
Time
Date
1
Space evaluation:
Space and layout
Floor covering
Impact and vibration
Lighting
Maintenance access
2
Environmental evaluation:
Ambient temperature
Humidity
Altitude
Atmospheric contamination
Air flow
3
Power evaluation:
Input power type
Power receptacles
1
Receptacle proximity to the
equipment
Dedicated circuit for power supply
Dedicated (separate) circuits for
redundant power supplies
UPS
2
for power failures
1.
Verify that the power supply installed in the chassis has a dedicated AC source circuit.
2.
UPS = uninterruptible power supply.
4
Grounding evaluation:
Circuit breaker size
CO ground (AC- powered systems)
5
Cable and interface equipment
evaluation:
Cable type
Connector type
Cable distance limitations
Interface equipment (transceivers)
6
EMI
3
evaluation:
Distance limitations for signaling
Site wiring
RFI
4
levels