HP Integrity Superdome 2 8/16 HP Integrity Superdome 2 User Service Guide - Page 85
Troubleshooting fabric issues, Troubleshooting clock related issues
View all HP Integrity Superdome 2 8/16 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 85 highlights
Test complete NOTE: The Test camnet command can be used on a single FRU while all partitions are running. Troubleshooting fabric issues The Superdome 2 system has fabric connections between the following major components: • Blade and XFM modules via enclosure upper backplane. • IOX and XFM modules using J-LINK cables • XFM and XFM modules using J-LINK cables (B32s only) To determine the healthy status for all crossbar connections, use the command HR> test fabric: IMPORTANT: The HR> test fabric requires complex outage. Before running HR> test fabric, all indicted and deconfigured parts must be cleared and the partitions (nPar and vPar) must be powered off. NOTE: Test fabric includes both test camnet and test clocks. OA1 HR> test fabric Begin test 1: System Fabric Components Acquitting any current fabric and CAMNet indictments, and deconfigurations. Beginning fabric test SUCCESS: System Fabric test complete System Fabric routed successfully. Begin test 2: Management Network Components CAMNet test has executed without finding faults Management connectivity test complete Begin test 3: Global Clock Components Clocks test started... Blade ========== Blade 1/1 Blade 1/2 Blade 1/3 Blade 1/4 Blade 1/5 Blade 1/6 Blade 1/7 Blade 1/8 Sys Clk 0 ========== OK OK OK OK OK OK OK OK Sys Clk 1 ========== OK OK OK OK OK OK OK OK GPSM ========== GPSM 1/1 * GPSM 1/2 * Int Clk ========== OK OK Ext Clk ========== ------- SUCCESS: Clocks test passed. Clocks test complete. Success: Fabric, CAMNet, and Global Clock tests completed with no errors Troubleshooting clock related issues Clocks are provided by the GPSM module and are redundant within a complex. Use the command HR> test clocks to check for clock related issues: NOTE: This command can be run while the partitions are active. HR> test clocks Troubleshooting fabric issues 85