HP ML370 HP ProLiant ML370 Generation 3 Setup and Installation Guide - Page 136
Installing the Cable Management Arm
UPC - 613326765616
View all HP ML370 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 136 highlights
Installing the Rack Server Installing the Cable Management Arm A triple-hinged cable management arm ships with each server. This arm attaches to the server chassis and to the rear frame of the rack. Hook-and-loop straps included with the management arm tie down and manage all cables leading to and from the server. Two hinges enable the cable management arm and cables to move forward through the rack when the server is extended. A third hinge allows the cable management arm to swing back and out of the way during hot-plug power supply installation and removal procedures. IMPORTANT: Install the cable management arm after the server is installed in the rack. To attach the cable management arm to the server and rack: 1. Align the two keyholes on the cable management arm over the spools on the rear panel of the chassis. 2. Slide the arm down (1) to secure the keyholes onto the spools. 3. Tighten the thumbscrew to secure the cable management arm to the server (2). Figure 4-11: Securing the cable management arm to the server HP ProLiant ML370 Generation 3 Server Setup and Installation Guide 4-13