HP ProLiant DL380 G3 with MSA1000 ProLiant DL380 Generation 3 Packaged Cluster - Page 35
Insert the front end of the left rack rail into the inside front of the rack. Be sure
View all HP ProLiant DL380 G3 with MSA1000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 35 highlights
Setup and Installation of the Packaged Cluster 3. Insert the front end of the left rack rail into the inside front of the rack. Be sure that the pins extend through the holes marked during the rack template procedure. IMPORTANT: Be sure that the scissor-type locking latches engage when the ends of the rail seat into the rack uprights. 2-20 HP ProLiant DL380 Generation 3 Packaged Cluster Setup and Installation Guide
Setup and Installation of the Packaged Cluster
3.
Insert the front end of the left rack rail into the inside front of the rack. Be sure
that the pins extend through the holes marked during the rack template
procedure.
IMPORTANT:
Be sure that the scissor-type locking latches engage when the ends of the rail
seat into the rack uprights.
2-20
HP ProLiant DL380 Generation 3 Packaged Cluster Setup and Installation Guide