HP StorageWorks 1606 HP StorageWorks 1606 Extension SAN Switch quick start ins

HP StorageWorks 1606 - Extension SAN Switch Manual

HP StorageWorks 1606 manual content summary:

  • 1
  • 2

HP StorageWorks
1606 Extension SAN Switch
quick start instructions
© Copyright 2009 Hewlett-Packard Development Company, L.P.
First edition: September 2009
The information in this document is subject to change without notice.
Printed in the U.S.
www.hp.com
AP862-96001
Overview
Read these instructions to set up and configure the HP StorageWorks
1606 Extension SAN Switch.
These instructions provide basic configuration steps. For detailed rack
mount and configuration instructions, download the
HP StorageWorks
8Gb SAN Switch hardware reference guide
from the Storage section of
the following HP website:
h
t
tp://w
w
w
.hp
.co
m/su
ppo
r
t/man
uals
.
Figure 1
shows the port side of the 1606 SAN Switch.
Figure 1 Port side of the 1606 SAN Switch
.
6. Fibre Channel ports (16)
1. System Power LED
7. GbE ports - copper RJ45(2)
2. System Status LED
8. GbE ports - optical SFP (6)
3. Console port (RJ–45)
9. Serial number pull-out tab
4. Ethernet management port
5. USB port
Verify the carton contents
Verify that the carton contains the following:
One 1606 SAN Switch with two integrated power supply/fan assem-
blies
One accessory kit with the following items:
Serial cable with an RJ-45 connector
Rubber feet, required to set up the switch as a standalone unit
Rack mount kit
HP StorageWorks product documentation, including
HP Storage-
Works SAN Rack Mount installation instructions
,
Read Me First
,
Safety Guides, User License, and Warranty
Two power cords.
Verify the installation requirements
To set up the 1606 SAN Switch for the first time, you will need the
following:
Workstation with an installed terminal emulator (such as HyperTermin-
al)
Unused IP address and corresponding subnet mask and gateway
address
Serial cable (supplied with the switch)
Ethernet cable
Access to an FTP server for backing up the switch configuration (op-
tional)
SFP transceivers and cables
IMPORTANT:
Order transceivers or cables separately. The 1606 SAN Switch
supports only transceivers and cables labeled B-series, SFP+, or
cable. See
h
t
tp://w
w
w
.hp
.co
m
for more information on
supported transceivers.
Plan the site environment
To ensure adequate cooling, install the switch with the non-port side
(which contains the air intake vents) facing the cool-air aisle. Verify that
the ambient air temperature does not exceed 40°C (104°F) and that the
ambient humidity remains between 20% and 85% while the switch is
operating.
To install and operate the switch successfully, ensure that:
The primary AC input is 100–240 VAC, 2.5 A–5.0A (the switch
autosenses the input voltage), 47–63 Hz.
The primary outlet is wired correctly, protected by a circuit breaker,
and grounded in accordance with local electrical codes.
The supply circuit, line fusing, and wire size are adequate, as spe-
cified by the electrical rating on the switch nameplate.
For specific power supply information, see the
HP StorageWorks 8Gb
SAN Switch hardware reference guide
.
Choose the rack mount
HP strongly recommends installing the switch in one of the following
optional
HP custom racks:
HP StorageWorks System/e Rack
HP StorageWorks 9000 Series Rack
HP StorageWorks 10000 Series Rack
HP StorageWorks 10000 G2 Series Rack
Follow these guidelines:
Use one rack unit (1U) in a 48.3 cm (19 in) cabinet.
Ground all equipment in the rack through a reliable branch circuit
connection, and maintain ground at all times. Do not rely on a sec-
ondary connection to a branch circuit, such as a power strip.
Ensure that airflow and temperature requirements are being met, es-
pecially if the switch is installed in a closed or multi-rack assembly.
Ensure that the additional weight of the switch does not exceed the
rack’s weight limits or unbalance the rack.
Secure the rack to ensure stability in case of unexpected movement.
For additional installation, electrical, environmental, and other con-
siderations, see the
HP StorageWorks 8Gb SAN Switch hardware
reference guide
.
Install a standalone switch
1.
Unpack the switch and verify the contents as described in
Verify the
carton contents
.
2.
Apply the adhesive rubber feet to prevent the switch from sliding off
the supporting surface.
a.
Clean the indentations at each corner on the bottom of the
switch to ensure that they are free of dust or other debris.
b.
With the adhesive side against the chassis, place one rubber
foot in each indentation and press into place.
3.
Place the switch on a flat, sturdy surface.
Set up a single-switch configuration
NOTE:
If you are installing the 1606 SAN Switch in a single-switch
configuration, you can use EZSwitchSetup to complete the basic
configuration.
To set up a single-switch configuration, you will need the following:
Standard screwdriver
Fixed IP address (IPv4 or IPv6) for the switch (no DHCP server)
Subnet mask value
Default gateway value
World Wide Name (WWN), located on the switch ID pull-out tab
Ethernet connection (hub or switch)
Ethernet and Fibre Channel cables
Disk array with Fibre Channel ports
Browser that allows pop-up windows
Power on the switch
1.
Connect the power cords to both power supplies and then to power
sources on separate circuits to protect against AC failure.
2.
Power on the power supplies by flipping both AC switches to the
position marked 1 (one).
The power supply LEDs are amber until power-on self-test (POST) is
complete, and then change to green. The 1606 SAN Switch takes
one to three minutes to boot and complete POST.
3.
After POST is complete, verify that the switch power and status LEDs
on the port side of the switch are green.
Connect the serial cable
1.
Connect the serial cable to the serial port on the switch and to an
RS-232 serial port on the workstation.
If the serial port is RJ-45 instead of RS-232, remove the adapter on
the end of the serial cable and insert the exposed RJ-45 connector
into the RJ-45 serial port on the workstation.
2.
Disable any serial communication programs running on the
workstation.