HP Z210 HP Z210 CMT Workstation Maintenance and Service Guide - Page 75

Disassembly order, Removing the cable lock (optional), If a cable lock is installed on the workstation

Page 75 highlights

Disassembly order For convenience, disassembly procedures should be followed in a particular order. Use the following table to determine the sequence in which to access major workstation components. Table 5-3 Workstation component installation To install/replace... Remove... Then remove... Then remove... Then remove... Then remove... Battery, front bezel, hard drive, memory, power supply, rear system fan, side access panel sensor, or solenoid lock Chassis lock Side access panel Processor Chassis lock Side access panel Heatsink Expansion card (PCI/PCIe) Chassis lock Side access panel Expansion card Expansion card support slot cover Front panel I/O assembly, optical bay filler, optical drive, power button assembly, or system speaker Chassis lock Side access panel Front bezel System board Chassis lock Side access panel Expansion card Expansion Heatsink support cards or DIMMs Removing the cable lock (optional) If a cable lock is installed on the workstation, remove it before servicing the workstation. ENWW Removing and installing components 63

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185

Disassembly order
For convenience, disassembly procedures should be followed in a particular order. Use the following
table to determine the sequence in which to access major workstation components.
Table 5-3
Workstation component installation
To install/replace...
Remove...
Then
remove...
Then
remove...
Then
remove...
Then
remove...
Battery, front bezel, hard drive,
memory, power supply, rear
system fan, side access panel
sensor, or solenoid lock
Chassis lock
Side access
panel
Processor
Chassis lock
Side access
panel
Heatsink
Expansion card (PCI/PCIe)
Chassis lock
Side access
panel
Expansion card
support
Expansion card
slot cover
Front panel I/O assembly, optical
bay filler, optical drive, power
button assembly, or system
speaker
Chassis lock
Side access
panel
Front bezel
System board
Chassis lock
Side access
panel
Expansion card
support
Expansion
cards or DIMMs
Heatsink
Removing the cable lock (optional)
If a cable lock is installed on the workstation, remove it before servicing the workstation.
ENWW
Removing and installing components
63