LG LMN090HE Service Manual - Page 71

When the louver does not operate., When Vertical Louver does not operate.

Page 71 highlights

Troubleshooting Guide Trouble 5 When the louver does not operate. When Vertical Louver does not operate. • Confirm that the Vertical Louver is normally geared with the shaft of Stepping Motor. • If the regular torque is detected when rotating the Vertical Louver with hands Normal • Check the connecting condition of CN-UP/DOWN Connector • Check the soldering condition(on PWB) of CN-UP/DOWN Connector Check the operating circuit of the Vertical Louver • Confirm that there is DC +12V between pin (RED) of CN-UP/DOWN and GND. • Confirm that there is a soldering short at following terminals. - Between 60 , 61 , 62 and 63 of MICOM - Between 2 , 3 , 4 and 5 of IC01M - Between 12 , 13 , 14 , 15 of IC01M - Between 1 , 2 , 3 , 4 and 5 of CN-UP/DOWN If there are no problems after above checks • Confirm the assembly conditions that are catching and interfering parts in the rotation radial of the Vertical Louver Service Manual 71

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86

Service Manual
71
Troubleshooting Guide
When the louver does not operate.
Trouble 5
When Vertical Louver does not operate.
• Confirm that the Vertical Louver is normally geared with the shaft of
Stepping Motor.
• If the regular torque is detected when rotating the Vertical Louver with
hands
Normal
• Check the connecting condition of CN-UP/DOWN Connector
• Check the soldering condition(on PWB) of CN-UP/DOWN Connector
Check the operating circuit of the Vertical Louver
• Confirm that there is DC
+
12V between pin
(RED) of CN-UP/DOWN and
GND.
• Confirm that there is a soldering short at following terminals.
- Between
60
,
61
,
62
and
63
of MICOM
- Between
2
,
3
,
4
and
5
of IC01M
- Between
12
,
13
,
14
,
15
of IC01M
- Between
1
,
2
,
3
,
4
and
5
of CN-UP/DOWN
If there are no problems after above checks
• Confirm the assembly conditions that are catching and interfering parts in
the rotation radial of the Vertical Louver