LG PQCSD130A0 Owner's Manual - Page 9
Connection Method of Function Scheduler
View all LG PQCSD130A0 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 9 highlights
ENGLISH Installation instruction Connection Method of Function Scheduler Turn off the power before the connection of Function Scheduler. 1 Connect colored cable of Function Scheduler to the corresponding terminal block of CN_REMO on the PCB of the central controller. Central controller Function controller CN_REMO cable RD terminal (12V) Red YL terminal (signal) Yellow BR terminal (GND) Black CN_REMO BR YL RD 2 Connect red wires and brown wires to the corresponding terminal of the central controller CN_REMO respectively as right where the central controller is installed the following figure. The group address of central controllers must be set between 0 and 7. 3 Close the central controller case and check operation after turning on the power. Caution 1. Use the communication cable provided with Function Scheduler. 2. Use 3P-0.75 Square Shield wires where cable extension is required. 3. Install cable length is within 1m. 4. If wiring is not proper, the product may be damaged or not operate when power is applied. Owner's & Installation Manual 9