Netgear GS724TS GS7xxTS Hardware manual - Page 16
Installation, Step 1: Preparing the Site - management
UPC - 606449049442
View all Netgear GS724TS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 16 highlights
Chapter 2 Installation This chapter describes the installation procedures for your NETGEAR Smart Switch. Switch installation involves the following steps: Step 1: Preparing the Site Step 2: Installing the Switch Step 3: Checking the Installation Step 4: Connecting Devices to the Switch Step 5: Installing an SFP GBIC Module Step 6: Installing a Device Step 7: Applying AC Power Step 8: Managing the Switch through a Web Browser or the PC Utility for Initial Configuration Step 1: Preparing the Site Before installing the switch, ensure the operating environment meets the requirements in the following table. Table 2-1. Site Requirements Characteristics Requirements Mounting Access • Desktop installations - Provide a flat table or shelf surface. • Rack-mount installations - Use a 19-inch (48.3-centimeter) EIA standard equipment rack that is grounded and physically secure. The rack-mount kit supplied with the switch is also required. Locate the switch in a position that allows access to the front panel RJ-45 ports, the ability to view the front panel LEDs, and easy safe access access to the power connector. v1.0, November 2007 2-29