Netgear RN102 Hardware Manual - Page 52
Memory Test Status, Power LED, Disk 1 LED, Backup LED
View all Netgear RN102 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 52 highlights
ReadyNAS OS 6 Desktop Storage Systems • Memory test. Performs a memory test. The memory test runs for eight hours. The current status and the pass or fail result is reported using the storage system LEDs, as described in the following table: Figure 17. Memory Test Status Memory Test State Power LED Disk 1 LED Disk 2 LED Backup LED First hour Off Off Off Blinking Second hour Off Off Blinking Off Third hour Off Blinking Off Off Forth hour Off Blinking Blinking Blinking Fifth hour On Off Off Blinking Sixth hour On Off Blinking Off Seventh hour On Blinking Off Off Eigth hour On Blinking Blinking Blinking Result: fail Blinking Blinking Blinking Blinking Result: pass On On On On • Test disk. Performs an offline full disk test. This process can take four hours or more, depending on the size of your disks. Any problems are reported in the system logs. For more information about viewing the system logs, see the ReadyNAS OS 6 Software Manual, which is available at support.netgear.com/product/ReadyNAS-OS6. To access the boot menu: 1. Power off your storage system. 2. Using a straightened paper clip, press and hold the Reset button. 3. Press the Power button. The system powers on. 4. Continue to press the Reset button until the Power button LED, USB and backup status LED, disk 1 LED, and disk 2 LED light. 5. Press the Backup button to scroll through boot mode options. NETGEAR ReadyNAS 212 52