Schwinn 222 Recumbent Bike Assembly Manual - Page 13

ASSEMBLY STAGE #5, Attach Handlebar Assembly and Run Cabling Through Handlebar Post

Page 13 highlights

ASSEMBLY STAGE #5 Attach Handlebar Assembly and Run Cabling Through Handlebar Post Assembly Hardware Required: NONE Step 11: Slide the HANDLEBAR ASSEMBLY (#2) into the receiver on the HANDLEBAR POST (#4). Slide the threaded post into the slider tube and attach the HANDLEBAR ASSEMBLY SLIDER TUBE (#2) and the HANDLEBAR POST (#4) by threading the ADJUSTMENT KNOB (#21) and the SMALL FLAT WASHER (#22) into the threaded post. Place the end cap on the end of the slider tube on the HANDLEBAR ASSEMBLY (#2). Step 12: Take the UPPER HR WIRE (#7) and the UPPER COMPUTER WIRE (#8) and slide them through the HANDLEBAR POST (#4) as pictured above.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16

ASSEMBLY STAGE #5
Attach Handlebar Assembly and Run Cabling Through Handlebar Post
Assembly Hardware Required:
NONE
Step 11:
Slide the
HANDLEBAR ASSEMBLY (#2) into the receiver on the
HANDLEBAR POST (#4).
Slide the threaded post into the slider tube and attach the
HANDLEBAR ASSEMBLY SLIDER TUBE (#2) and the HANDLEBAR POST (#4) by
threading the ADJUSTMENT KNOB (#21) and the SMALL FLAT WASHER (#22) into
the threaded post.
Place the end cap on the end of the slider tube on the HANDLEBAR
ASSEMBLY (#2).
Step
12
:
Take the UPPER HR WIRE (#7) and the UPPER COMPUTER
WIRE (#8) and slide them through the HANDLEBAR POST (#4) as
pictured above.